شرکت دانش بنیان مبتکر بتن سورین

 
Saturday, 02 December 2023 12:55

Control tower | port of Deylam

Written by
Rate this item
(0 votes)


Location of Dilam port
The employer of Dilam Ports Organization
GRC panel materials used
The area is 350 square meters
The project started in 2021
The duration: 3 months

 


 GFRC panel

 

 

control tower gfrc panel

 

Read 254 times Last modified on Saturday, 02 December 2023 13:03

Leave a comment

نظر شما بعد از تایید مدیر سایت نمایش داده خواهد شد