Shiraz residential complex project
Location of Shiraz
Private employer
The size of the project is 200 square meters
Materials used in GFRC panels
The year the project started was 1400
The duration of the project is 1 month
GRC Nama Project, Bandar Abbas residential project
Design, production and installation of GRC facade panel
Name of Bandar Abbas residential complex project
The location of Bandar Abbas
Private employer
The materials used are GFRC concrete panels
The dimensions of the panels, Moqrans GRC concrete panels
The duration of the project is 4 months
The name of project is Iranmal tennis season
Location of Tehran
The employer is Pars Gofka Engineering Company
The main employer of Alborz Tat Company
Materials used are metal billets
The duration of the project is 5 months
The project of steel facade canopies at the entrance door of Iran's Grand Bazaar - Iranmal
The name of the Iranmal entrance gate project
Location of Tehran
The employer is Pars Gofka Engineering Company
The main employer of Alborz Tat Engineering Company
The materials used for the metal joints
Project duration
11 months
The name of the project is Hasina oshaq al-Hossein project
Location of Tehran
Private employer
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Tehran Address - South Zalgh, Imam Hossein Square, Tehran - Safa St. - Hasina Eshgha Al Hossain
The duration of the project is 3 months
The name of the project is the Mozeef
The location of Salihiyah in Baghdad
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Address Baghdad - Salehiya area - next to the Embassy of the Islamic Republic of Iran - Mozaif building
The duration of the project is 4 months