شرکت دانش بنیان مبتکر بتن سورین

 

Displaying items by tag: GFRC

Saturday, 02 December 2023 12:55

Shiraz residential complex project

 


Shiraz residential complex project
Location of Shiraz
Private employer
The size of the project is 200 square meters
Materials used in GFRC panels
The year the project started was 1400
The duration of the project is 1 month

 

 

grc 0006 

 

 grc 0007

 

 

 

 

Published in GFRC Projects
Saturday, 02 December 2023 12:55

GRC Nama Project| Bandar Abbas residential project

 

GRC Nama Project, Bandar Abbas residential project
Design, production and installation of GRC facade panel
Name of Bandar Abbas residential complex project
The location of Bandar Abbas
Private employer
The materials used are GFRC concrete panels
The dimensions of the panels, Moqrans GRC concrete panels
The duration of the project is 4 months

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC

 

پنل نما GFRC GRC 

Published in GFRC Projects


The name of project is Iranmal tennis season
Location of Tehran
The employer is Pars Gofka Engineering Company
The main employer of Alborz Tat Company
Materials used are metal billets
The duration of the project is 5 months

 

 

بلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مالبلت استادیوم تنیس ایران مال 

Published in GFRC Projects

The project of steel facade canopies at the entrance door of Iran's Grand Bazaar - Iranmal

 

The name of the Iranmal entrance gate project
Location of Tehran
The employer is Pars Gofka Engineering Company
The main employer of Alborz Tat Engineering Company
The materials used for the metal joints
Project duration

11 months

نمای کناپی ایارانمالبازار بزرگ ایراننما استیلساخت نمای استیلنما پارامتریکپنل نما پارامتریکنما کناپی ایران مالنما کناپی بازار بزرگ ایران

 

 

 

 

 

 

 

 

 

 

Published in GFRC Projects
Saturday, 02 December 2023 12:55

Hasina mosque of Oshagh al-Hossein

GFRC facade project of Hasina oshaq Al-Hossein, Tehran
Design, production and installation of GFRC facade panels

 

The name of the project is Hasina oshaq al-Hossein project
Location of Tehran
Private employer
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Tehran Address - South Zalgh, Imam Hossein Square, Tehran - Safa St. - Hasina Eshgha Al Hossain
The duration of the project is 3 months

 

 

 

123




Published in GFRC Projects

GFRC Facade Project of Mozaif Building - Embassy of the Islamic Republic of Iran in Salihiya, Baghdad
Design, production and installation of GFRC facade panels

 

The name of the project is the Mozeef
The location of Salihiyah in Baghdad
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Address Baghdad - Salehiya area - next to the Embassy of the Islamic Republic of Iran - Mozaif building
The duration of the project is 4 months

 

 

 



نمای جی آر سی


3

Published in GFRC Projects
Page 2 of 2