The project of steel facade canopies at the entrance door of Iran's Grand Bazaar - Iranmal

 

The name of the Iranmal entrance gate project
Location of Tehran
The employer is Pars Gofka Engineering Company
The main employer of Alborz Tat Engineering Company
The materials used for the metal joints
Project duration

11 months

نمای کناپی ایارانمالبازار بزرگ ایراننما استیلساخت نمای استیلنما پارامتریکپنل نما پارامتریکنما کناپی ایران مالنما کناپی بازار بزرگ ایران

 

 

 

 

 

 

 

 

 

 

GFRC facade project of Hasina oshaq Al-Hossein, Tehran
Design, production and installation of GFRC facade panels

 

The name of the project is Hasina oshaq al-Hossein project
Location of Tehran
Private employer
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Tehran Address - South Zalgh, Imam Hossein Square, Tehran - Safa St. - Hasina Eshgha Al Hossain
The duration of the project is 3 months

 

 

 

123




GFRC Facade Project of Mozaif Building - Embassy of the Islamic Republic of Iran in Salihiya, Baghdad
Design, production and installation of GFRC facade panels

 

The name of the project is the Mozeef
The location of Salihiyah in Baghdad
The materials used are GFRC facade panels
Dimensions of panels in two sizes (customized)
Address Baghdad - Salehiya area - next to the Embassy of the Islamic Republic of Iran - Mozaif building
The duration of the project is 4 months

 

 

 



نمای جی آر سی


3

Saturday, 02 December 2023 12:55

Mica-mall GRC panel

Written by

 

 

 

Project Name: Mica-mall Commercial Office Complex
Location : Kish Island
The employer is the tourism bank and  private sector
The materials used are GFRC facade panels
The size of the project is 4000 square meters
The start of the project in 2018
The duration of the project is 12 months
the last part of this(about 4000 square meters) project was produced by Mobtaker Beton Sorin Company.

 

 sorin-gfrc-07.jpg

 

 

sorin-gfrc-05.jpg

 sorin-gfrc-06.jpg

 

 

Location : Tehran
The employer : Parsazeh Engineering Company
Materials used are light aluminum panels
The size of the project is 3500 square meters
The start of the project in 1400
The duration of the project is 8 months

 

 

 

 

sorin-gfrc-10.jpg

 

 sorin-gfrc-011.jpg

 

 

 

Saturday, 02 December 2023 12:55

Iranmall Tennis stadium

Written by

 

 

Location : Tehran
The employer : Pars Gofka Engineering Company
Description of making clamp and belts
The area is 4000 square meters
The start of the project in 2018
The duration of the project is 6 months

 

 

 

 sorin-gfrc-03.jpg


 sorin-gfrc-04.jpg

Saturday, 02 December 2023 12:55

Iranmall gates

Written by

 

Location :Tehran
The employer : Pars Gofka Engineering Company
Description of making clamp connections
2,000 square meters
The start of the project in 2018
The duration of the project is 6 months

 

 

 


 sorin-gfrc-09.jpg

Saturday, 02 December 2023 12:55

Shiraz residential complex

Written by

 

Location : Shiraz city
Public sector: employer
Description of the GRC panel
The area is 300 square meters
The start of the project in 1400
The duration of the project is 1 month

 

 

 


 grc

 

grc

Saturday, 02 December 2023 12:55

Ba'ath Mahshahr Stadium

Written by

 

Location :  Mahshahr city
The employer : National Petrochemical Company of Iran
GRC panel materials used
The area is 3000 square meters
The start of the project in 1400
The duration of the project is 9 months

 

 

 


 جی آر سی

 

grc 0008

 

Saturday, 02 December 2023 12:55

Holiday Hotel | Kish Island

Written by

 

Location : Kish Island
Holiday hotel : employer
The area is 10,000 square meters
The start of the project in 2023
The duration of the ongoing project


 GFRC used in Hotels